Live build — WiringLast update: 24 Aug 2026
A large new-build home in Midrand, taken as a KNX project from the structure up — follow it from bare conductors to the first scene.

A new-build residence in Midrand, taken as a KNX project from the first drawing. We’ll post each stage here as it happens.
Distribution boards in
KNX distribution boards populated and the Hager actuators set out, ready to be addressed against the group-address schedule.


First fix underway
Containment run through the slabs and the climate manifolds mounted — every cable labelled before anything gets closed up.


Structure taking shape
The home coming out of the ground — a long, low concrete frame that the KNX topology was planned around from the first drawing.